Sectors We Serve

Built for Your Market

Every building sector brings its own MEP scoping logic, specification standards, and coordination challenges. We've worked across all of them — so you get a takeoff built for your project type, not a generic quantity list.

Commercial Office & Retail

Office Buildings & Retail Centers

Open floor plates, VAV zoning, and high-density branch circuits define commercial MEP. We understand tenant demising, phased fit-outs, and the lighting control and HVAC zoning complexity in multi-tenant buildings.

  • VAV box and duct branch takeoffs by zone
  • Lighting circuits and control zones by floor
  • Tenant storefront plumbing rough-in counts
  • BAS/EMS sensor and controller quantities
  • Tenant separation — common area vs. leasable
Healthcare

Hospitals, MOBs & Clinics

Healthcare MEP is among the most complex and consequential estimating work in construction. Critical/normal power separation, med gas distribution, and infection-control HVAC require deep attention and clear documentation.

  • Med gas riser and outlet counts by room type
  • Critical vs. normal power circuit separation
  • Pressure relationship and filtration HVAC by zone
  • Redundant systems: AHU, plumbing, electrical
  • OR and procedure room specialty systems
Industrial & Manufacturing

Warehouses, Plants & Facilities

Industrial projects combine heavy electrical infrastructure, process piping, and code-mandated seismic bracing. We separate shop-grade exposed services from office-grade concealed runs — giving vendors clean, context-specific pricing.

  • Compressed air mains and distribution headers
  • Heavy feeders and industrial panel schedules
  • Oil-water separators and process waste piping
  • Gas-fired unit heaters and overhead heating
  • Seismic bracing quantities by zone
Multifamily & Mixed-Use

Apartments, Condos & Mixed-Use

Repetitive unit typicals make multifamily takeoffs fast — when done right. We lock unit type assemblies first, then handle common areas, amenity spaces, and garage systems separately to prevent scope confusion.

  • Unit typical assemblies by bedroom count
  • Domestic hot water recirc and riser quantities
  • Corridor and common area HVAC/lighting
  • EV charging infrastructure for parking
  • Amenity: fitness, pool, clubhouse MEP
Education

K–12 Schools & Higher Education

Education projects often involve phased summer construction, lab exhaust requirements, and tight budget controls driven by public funding. We've worked on everything from elementary school HVAC upgrades to university laboratory fit-outs.

  • Lab exhaust and chemical fume hood takeoffs
  • AHU and rooftop unit replacement scoping
  • Low-voltage: AV, access control, intercom
  • Phased summer construction packaging
  • Public bid document formatting support
Government & Transit

Civic Buildings, Terminals & Transit

Government and transit projects come with detailed specifications, public procurement requirements, and complex maintenance facilities. We've handled operations buildings, transit maintenance facilities, and civic infrastructure takeoffs.

  • Transit maintenance facility process systems
  • Trench drains and floor drain systems
  • Site utilities scoping from civil drawings
  • Bid packaging for public procurement
  • Roof penetrations coordinated with structural

Sector-specific, not generic

A generic takeoff template misses the scope nuances that separate an accurate estimate from a risky one. When we work on a hospital, we're thinking about infection-control zones and critical power sequences. When it's a warehouse, we're separating shop services from office services from day one.

Tell us your project type and we'll confirm how we approach that sector — including any assemblies, spec templates, or format preferences that would make the deliverable drop directly into your estimating workflow.

Discuss Your Project

What to send us

01
Drawing set

PDF, DWG, or RVT — latest issued set with addenda and specs if available.

02
Bid date

So we can confirm a realistic delivery schedule and flag any scope gaps.

03
Trade scope

M, E, P, or full MEP — plus any alternates or VE scenarios you want priced.

04
Format preferences

Your Excel template, cost codes, or markup software preference.

Don't see your sector?

We work across many building types. Send us your drawings and we'll confirm if we're the right fit — no obligation.